The Kitchen Installer - Your Everything
Monday, April 30, 2007 at 06:55PM
Susan Serra, CKD in Surviving Remodeling

kitchen installation 1You know from time to time I delve into those touchy subjects. After all, as I've said before, you simply cannot do a complete kitchen remodel without being stressed about something. So it is my duty to provide those stressful issues to my readers! Better reading about them than living them. Hopefully, I can help channel some stress into awareness and information. What is to follow are remodeling scenarios at their most stressful.

You've been through the whole process, the contractors, their tradespeople, the inconvenience, change orders, delays. You're tired and you've had it. Stop right here. Is this typical at this stage to feel this way? That's a trick question. The larger the renovation, the more impatient people become later on, understandably. But, of course, one can never generalize, and people are as different as their kitchens!

All is prepared in the kitchen for the installation. The cabinetry is delivered, and a brand, new, shiny source of stress is beginning. Here is a huge investment in cabinetry that will change your quality of life. You are ready for the perfect installation.

We are assuming the kitchen installer is a sub contractor from the kitchen designer. In my world, I have already had a lengthy relationship with my clients designing his/her/their kitchen, but they have not met my installer.  

Here are some tips to know about kitchen installers.

 

As we say in my business, it is not the problem, it's how it's addressed that is important. This entry morphed just a bit into problem areas with installations, and that will also be covered in a big way in later entries.

Hang in there it will all be over soon!! 

So, when DO you know you have a problem with an installer? What are the signs? Find out soon!

 

Article originally appeared on The Kitchen Designer (http://sserrackd.squarespace.com/).
See website for complete article licensing information.